Banner Image

today's posted documents
For Power Users
FULL TEXT CRS DOCUMENTS
Find documents

Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress


The DD(X), CG(X), and LCS programs raise several oversight issues for Congress. Options for Congress for the DD(X) program include approving the program as proposed by the Navy and supplementing the industrial base, if needed, with additional work; accelerating procurement of the lead DD(X) to FY2006 and the second DD(X) to FY2007; deferring procurement of the lead DD(X) to FY2008; procuring two or more DD(X)s per year; building DD(X)s at a single yard, or building each DD(X) jointly at two yards; terminating the DD(X) program now (or after procuring a single ship as a technology demonstrator), and supplementing the industrial base with additional work until the start of CG(X) procurement; and starting design work now on a smaller, less expensive alternative to the DD(X) and procuring this new design, rather than DD(X)s or CG(X)s, starting around FY2011. Options for Congress on the LCS program include shifting procurement funding for LCS mission modules to the Navy's ship-procurement account; procuring a few LCSs and then evaluating them before deciding whether to put the LCS into larger-scale series production; procuring LCSs at a rate of up to 10 per year; procuring LCSs at a rate of less than 5 per year; terminating the LCS program and instead procuring a new-design frigate; and terminating the LCS program and investing more in other littoral-warfare improvements.


This package includes following files:
# File Name Document Date Order ID: Number of Pages Price
1 RL32109_08_17_2005.pdf Jul 29, 2005 RL32109 96 $29.95 Add to Cart

Older Versions: